- Project
- Deep Pit Bridge, Wigan
Mersey Gateway, Widnes
| Location |
|
|---|---|
| Sector | Highways |
| Products |
Mersey Gateway was a multi-million pound investment to deliver a new six-lane toll bridge to ease the existing congested and ageing Silver Jubilee Bridge between Runcorn and Mersey.
A new solution was needed to provide relief from the huge traffic congestion in the area. This formed part of a wider regeneration project and a new and improved link road between North Cheshire and Merseyside.
We worked in partnership with the client and main contractor to understand the challenges at an early stage of the project. This ensured we could advise the best value engineered design to deliver a bespoke propping system.
This system supported the landside sections, which create the approach to the bridge. Its role was critical in supporting the bridge loads onto the permanent concrete piers, by transferring the load of the bridge.
To ensure key insight on movement and load was available 24/7, we set up our structural monitoring. This information fed back to Insite – our monitoring web portal. Bespoke alerts and data was then delivered in real time, ensuring that all stakeholders had the insight they needed.
View our Propping Range
For all project specific design and technical enquiries, please contact your local service team
If you want to talk to us about your project, send us an email and a brief outline of how we can help and we’ll be in touch