Unprecedented levels of rainfall caused extensive flooding in the Pooley Bridge area, leading to the collapse of the 18th century bridge.

The challenge

Pooley Bridge village was cut in two by the extensive flooding and isolated from the west bank, causing considerable disruption to residents and businesses.

This led to an urgent need for a temporary bridge during the design stage of a new, permanent structure.

Bridge Collapse

Unprecedented rainfall caused severe flooding in Pooley Bridge, resulting in the collapse of the 18th century structure.

Community Disruption

The village was split in two and cut off from the west bank, creating major disruption for residents and local businesses.

Urgent Temporary Crossing

During the design of a new permanent bridge, an immediate temporary solution was required to restore access and reconnect the community.

 

Our solution

We worked with Story Contracting to install our largest bridging solution – Mabey Universal Vehicle Bridge – to accommodate pedestrians and two lanes of traffic.

We returned in 2019 to remove the temporary road bridge when the construction of the permanent structure began. Our temporary Pedestrian BeamBridge was then installed to allow pedestrian access while the works were carried out.

Learn more about our bridges

Related news and projects

Contact Phone Number

Give us a call

For all project specific design and technical enquiries, please contact your local service team

Send us an email

If you want to talk to us about your project, send us an email and a brief outline of how we can help and we’ll be in touch

[email protected]

Get updates
on our latest news,
solutions and projects