Our Mass range is one of the most versatile modular shoring and propping systems available on the UK market.
Our Mass 50 propping system has been designed with maximum flexibility in mind, and using a large range of off-the-shelf components, can be used to create individual shoring, brace towers, trusses and large, complex façade retention structures.
The Mass 50 system is made up of components which are compact enough to be manhandled if necessary. The robust design, from galvanized cold formed steel allows it to support loads of up to 600kN on a single leg. Projects can therefore be completed with fewer components thus saving on assembly time.
The Mass 50 system also has both mechanical and hydraulic capacity and can be supported with our real-time load monitoring system.
If you’re working with a lower load capacity of less than 340kN, why not take a look at our other system within the Mass range – Mass 25.
View or download here
For all project specific design and technical enquiries, please contact your local service team
If you want to talk to us about your project, simply send us an email and a brief outline of how we can help and we'll be in touch
As part of the second phase of renovation works to Barmouth Viaduct, a range of temporary works solutions were required to facilitate the replacement of the bridge’s existing hogback trusses. A variety of our equipment was specified to help manoeuvre the new supports into place.
Find out moreWhen engaged to create the foundation for the new 2 Finsbury Avenue complex, Cementation Skanska sought our support for our temporary works expertise. As a result of the depth of three excavated basement levels, a robust propping system was required.
Find out moreWhen it came to installing the new Allerdene bridge as part of a multimillion-pound National Highways upgrade to the A1 network, temporary works was a critical element given the poor ground conditions on site. Costain turned to us for our expertise.
Find out moreBespoke freestanding propping solution taken 60 metres underground to help construct a key piece of infrastructure during multi-billion pound Tideway project in London.
Find out moreDuring the complex reconfiguration of a landmark Manchester property into a contemporary residential development, we were called upon to supply the most effective temporary works solution possible.
Find out moreDuring development works to a Grade I listed building in the heart of Glasgow’s financial district, we used digital technology and our propping system to protect the original façade of the historic building.
Find out moreWhen stonework began to crumble from a block of flats in Huddersfield during routine maintenance work, immediate action had to be taken. Our emergency propping made the building safe for repairs.
Find out moreWhen a lorry smashed into one of the main supports beneath a bridge over the M6 in Lancashire, the structural integrity of the bridge was severely compromised. Our emergency response team were called in to provide a propping and jacking solution to quickly support the bridge.
Find out moreAs part of a £34 million investment by the Department for Transport (DfT) into re-introducing passenger services between Newcastle and Ashington, a number of upgrades are being made to the Northumberland Line. To assist with these works, a range of our propping solutions were required to facilitate the safe and efficient installation of a new underpass.
Find out moreOur engineered solutions range from standard designs to major projects, through to emergencies. We can also offer an end-to-end service from design and supply through to installation and removal.