Designed in-house by our highly experienced engineers, this system is unique to the UK market in its ability to support loads of up to 8000kN.
Our Mabey Universal Towers are extremely heavy duty. Capable of supporting loads up to 8000kN, it can also be used as a free standing tower.
Perfectly suited to extremely heavy duty propping projects, this system has been used on some of the biggest propping projects in the UK, for example the construction of the Mersey Gateway.
Our MU Tower system is made up of a small number of components, meaning that a large section of the tower can be built extremely quickly. The tower can be erected in situ or as separate sections on the ground and lifted in by crane.
View or download here
For all project specific design and technical enquiries, please contact your local service team
If you want to talk to us about your project, simply send us an email and a brief outline of how we can help and we'll be in touch
A new solution was needed to provide relief from congestion on an ageing bridge in Widnes. The high profile and complex project required significant temporary works support and we used our expertise to deliver a bespoke propping and monitoring scheme.
Find out moreJunction 6 of the M6 motorway, commonly known as spaghetti junction, is famous for very heavy traffic. When it was at risk of collapse, we quickly stabilised and propped the motorway section to prevent it, whilst minimising any disruption to the M6.
Find out moreOur engineered solutions range from standard designs to major projects, through to emergencies. We can also offer an end-to-end service from design and supply through to installation and removal.