Designed in-house by our highly experienced engineers, this system is unique to the UK market in its ability to support loads of up to 8000kN.

Features

Maximum load bearing capacity: 8000kN
Extremely quick to build

Our MU Towers

Our Mabey Universal Towers are extremely heavy duty. Capable of supporting loads up to 8000kN, it can also be used as a free standing tower.

Perfectly suited to extremely heavy duty propping projects, this system has been used on some of the biggest propping projects in the UK, for example the construction of the Mersey Gateway.

Our MU Tower system is made up of a small number of components, meaning that a large section of the tower can be built extremely quickly. The tower can be erected in situ or as separate sections on the ground and lifted in by crane.

Heavy duty propping

Resources

View or download here

Get in touch with us

Give us a call

For all project specific design and technical enquiries, please contact your local service team

    Send us an email

    If you want to talk to us about your project, simply send us an email and a brief outline of how we can help and we'll be in touch

    action@mabeyhire.co.uk

    It looks like you are working with our

    So that we can assist you further, could you share a few details and your download will start straight away.