Safeguarding water treatment assets with structural monitoring

Felindre Water Treatment Works, South Wales

Felindre Water Treatment Works in South Wales is one of the largest plants in the country, producing water for up to 600,000 customers in Swansea, Carmarthenshire, Bridgend and West Cardiff. During groundworks excavations on site, a range of our structural and environmental monitoring equipment were used to ensure the structural safety of existing infrastructure & buildings. 

Overview

One of the largest Water Treatment Works plants in the country
Bypass pipeline being constructed during maintenance and upgrade works 
Structural monitoring solution required

Products used on this project

The challenge

As part of maintenance and upgrade works at Felindre Water Treatment Works, a bypass pipeline had to be constructed to enable chlorine contact tanks to be isolated. To facilitate the works, a trench was excavated, measuring seven metres at its deepest point and located in close proximity to an existing water retaining structure. As a result, there were concerns that the building may experience cracking or subsidence due to structural movement or vibrations from plant equipment.

With this in mind, Young Bros Civil Engineering, who were contracted to deliver the groundworks, required a structural monitoring solution.

Our solution

Due to the need to monitor the critical infrastructure for structural movement throughout the works, we supplied our automated total station. Once installed on site, live data was transmitted to our Insite web portal, where the customer could easily monitor the structural stability of the building and be alerted should any movement be detected.

We also supplied our Portable Vibration Monitor, which could be easily moved around site for use when required. A lightweight unit, housed in an IP67 rated case, it features both audible and visual alert beacons to warn of any vibration level breaches.

Speaking about the project, Jordan Jones, Framework Commercial Manager at Young Bros Civil Engineering Ltd, said: “The vibration monitoring equipment was required due to the works being undertaken near critical infrastructure at the water treatment works. Mabey Hire’s monitoring solutions gave us the confidence and assurance that our works were not affecting the existing structures on site, enabling us to continue safely. At Young Bros, we’ve engaged the services of Mabey Hire previously and knew that their service could be relied on.”

Got a similar project coming up? Get in touch today to discuss your requirements >

It looks like you are working with our

So that we can assist you further, could you share a few details and your download will start straight away.